During the past 10 months, CP&R performed Building Envelope & Waterproofing Upgrades at Fannie Mae’s corporate office located in Reston, Virginia. The scope of the project involved complete removal of the existing lighting, drainage, planters, pavers, topping slabs, and waterproofing at the West Plaza and Rotunda as well as selective demolition, concrete repairs, precast panels, and unit masonry assemblies.
The project also involved manufacturing and installing custom architectural exposed structural steel trellis, custom glass canopies, new pavers, planters and all new state of the art lighting and landscaping. This project took place during one of the worst winters this area has seen in twenty years. There were also many challenges throughout this project due to hidden and unforeseen conditions but CPR was able to work very close with Fannie Mae’ s design team and engineers to minimize cost and delays.
Curious to see the outcome of this project? Take at a look at the pictures!
Friday, 24 October 2014
Monday, 20 October 2014
Garage Repair: Consolidated Rental Car Facility Garage
Since May 2013, CPR has been working hard to complete garage repairs to the Consolidated Rental Car Facility Garage located at the Baltimore/Washington International Thurgood Marshall Airport. The scope of the project included tasks such as:
- Repair of concrete cracks and spalls in the garage, slabs, walls, columns, beams, parapets, and ceilings.
- Repair of pipe guards and pipe bollards.
- Removal and replacement of existing expansion joints and of cracked elastomeric concrete of joint seals.
- Application of sealer on concrete traffic decks and ramps and restriping of pavement markings as well as repainting stairs towers.
Are you flying to or from BWI this weekend? If yes, you can check out this project in person. Otherwise, check out some of pictures of this project!
- Repair of concrete cracks and spalls in the garage, slabs, walls, columns, beams, parapets, and ceilings.
- Repair of pipe guards and pipe bollards.
- Removal and replacement of existing expansion joints and of cracked elastomeric concrete of joint seals.
- Application of sealer on concrete traffic decks and ramps and restriping of pavement markings as well as repainting stairs towers.
Are you flying to or from BWI this weekend? If yes, you can check out this project in person. Otherwise, check out some of pictures of this project!
Friday, 10 October 2014
Post-Tension Repair at 1425 New York Avenue
From February to October 2014, CP&R provided post-tension repair at a sub-grade parking garage located at 1425 New York Avenue, Washington, DC. The original garage structure was built around 1985. The garage consists of three elevated levels and one mat slab foundation that is also constructed with post tension cables. Therefore, CP&R completed full depth repair at the flat slabs, partial depth overhead repairs at the flat slabs as well as vertical partial depth repairs at the walls, beams, elevated decks, soffits, columns, and storage room at each garage level. We are proud of completing yet another successful project.
Check out some pictures of the project!
Friday, 5 September 2014
CPR Receives Award of Merit from The International Parking Institute (IPI)
![]() |
| The Pratt Street Garage |
On May 2nd 2012, CP&R signed a contract for The Pratt Street Garage phase II repair project. The work consisted of removal and replacement of the existing topping slabs at levels P-1 thru P-9 as well as misc. concrete repairs to all pre-cast double T’s and beams. CPR was also in charge of replacing all of the expansion joints and coating at the expansion joints thru these same levels. We started the phase II project on June 4th 2012 and completed it on August 8th 2013. Last week, CPR was proud to receive an Award of Merit from the International Parking Institute (IPI) for the work completed at the garage. We congratulate Chris Glorioso (Sr. Project Manager), Richard Morrow (Superintendent), and the entire crew for completing another exceptional project. Dedication does pay off!!
Tuesday, 15 July 2014
Carbon Monoxide on the Job Site
CPR's Safety Director, Charles J. Brienza, CHST, has a new article entitled Carbon Monoxide published in the July/August 2014 issue of the ICRI's Concrete Repair Bulletin. The article discusses the threat posed by carbon monoxide on the job site, and steps that you can take to protect your crew. You can read the article HERE.
Read other articles in the Concrete Repair Bulletin HERE.
Read other articles in the Concrete Repair Bulletin HERE.
Friday, 23 May 2014
OSHA's Top Ten Most Frequently Cited Standards
Friday, 25 April 2014
Toby L Harrod, Sr
Born: Mon., Aug. 3, 1970
Died: Mon., Sep. 9, 2013
Toby, we were extremely grateful to have you as a member of the CPR Family. Reflecting upon your passing we will always cherish your memories as a celebration of your life. May your soul and all the souls of the faithful departed rest in peace!
Died: Mon., Sep. 9, 2013
| The reflection in the window is the image of Toby. The picture was taken by Toby at Marbury Plaza,one of the last jobs Toby performed for CPR. |
Subscribe to: